Guide · Static control

Why static accumulator oils start loading at 1 m/s

Updated 2026-10-08 · About 5 min read

In one sentence

Where a flammable atmosphere may form, static accumulator oils start at no more than 1 m/s until the inlet and bottom structure are covered to a depth of twice the inlet pipe diameter; later rates still depend on cargo and operating conditions.

Why the start needs a limit

  • Low-conductivity oils can retain charge generated by flow. An uncovered inlet adds turbulence and charged spray; a discharge source in a flammable atmosphere can ignite it.[B1]

From initial loading to a higher rate

  1. 1

    Establish the loading scenario

    Assess static accumulation from cargo properties, tank atmosphere and the ship’s procedure rather than assigning one rate to every oil.[B1]

  2. 2

    Apply the initial limit

    Where a flammable atmosphere may form, keep the initial velocity for static accumulator oils at or below 1 m/s and avoid splash loading.[B1]

  3. 3

    Check immersion, not elapsed time

    Confirm that the inlet and bottom structure are covered to twice the inlet pipe diameter before setting the subsequent rate for the cargo and conditions.[B1]

Separate controls have separate purposes

  • The initial rate controls charging from flow and splash. Check post-loading sampling, gauging and waiting arrangements against the tank atmosphere and shipboard procedures. Waiting does not replace the immersion criterion; follow the latest operating requirements applicable to the vessel.[B1]
  • Control sampling, gauging and conductive objects introduced into tanks under the ship’s procedure, with bonding and earthing where required.[B1]
  • Electrical discontinuity at the ship/shore arm or hose controls arcing from stray currents during connection or disconnection; it is distinct from bonding objects used inside a tank.[B2]

A higher rate needs an operating basis

  • After the immersion criterion is met, determine subsequent rates from cargo properties, the loading plan and operating conditions. Check the ship/shore agreement and the latest operating requirements applicable to the vessel; this page does not assign a universal subsequent velocity limit.[B1]

Questions

Can the rate rise after a set initial period?

Elapsed time alone is insufficient. Confirm the two-diameter immersion criterion for the inlet and bottom structure.

Is 1 m/s the limit for the whole loading operation?

It is the initial limit for the stated risk scenario; subsequent rates are separately determined after the immersion criterion is met.

Can a ship/shore bonding cable replace an insulating flange?

A bonding cable should not be treated as a substitute. Ship/shore electrical discontinuity is a separate interface control.