Guide · Ship/shore coordination

How the ship/shore safety checklist (SSSCL) works

Updated 2026-10-08 · About 7 min read

In one sentence

The ISGOTT 6 ship/shore checklist uses Parts 1–9 for staged checks: tanker and terminal complete their assigned checks, agree transfer arrangements, sign the declaration and record repeat-check intervals, with prompt review when conditions change.

Order of parts in the public checklist

PartContent and responsibilityTag and source
1A / 1BTanker pre-arrival checks; 1B applies when using an inert gas system.Disclosed[S1]
2Terminal pre-arrival checks.Disclosed[S1]
3 / 4Checks after mooring: 3 for the tanker, 4 for the terminal.Disclosed[S1]
5A / 5B / 5CJoint pre-transfer conference: 5A general, 5B bulk liquid chemicals, 5C liquefied gases.Disclosed[S1]
6Ship/shore pre-transfer agreements, with details and initials from both parties.Disclosed[S1]
7A / 7B / 7CTanker pre-transfer checks: 7A general, 7B before crude oil washing, 7C before tank cleaning or ventilation to remove vapours.Disclosed[S1]
DeclarationConfirm applicable Parts 1–7, sign jointly and agree repeat-check intervals.Disclosed[S1]
8 / 9Repetitive checks during and after transfer: 8 for the tanker, 9 for the terminal.Disclosed[S1]

Completion sequence

  1. 1

    Check responsibilities and exchange information

    Before arrival and after mooring, each side checks its assigned items and selects conditional sections for the equipment and operation.[S1]

  2. 2

    Agree transfer arrangements

    At the pre-transfer conference, confirm communications, the transfer plan and emergency arrangements; enter agreed details and both parties’ initials in Part 6.[S1]

  3. 3

    Sign the declaration and keep checking

    Sign the declaration after applicable items are completed, enter tanker and terminal repeat-check intervals, then record time and status in Parts 8 and 9.[S1]

Intervals are agreed values

  • The public declaration provides separate maximum-interval blanks for tanker and terminal, without a universal fixed number of hours. Agree intervals for the operation’s risks and continue checks after the initial signature.[S1][B1]

Unmet items and changing conditions

  • Explain and resolve unmet items rather than marking an expected future condition as satisfied; the checklist must reflect the actual situation.[B1]
  • Promptly communicate changes in weather, moorings, communications, equipment or operating conditions, with correction or suspension and review where needed.[B1]

Questions

Does each side jointly complete every part?

No. Pre-arrival, post-mooring and repeat checks assign responsibilities separately; the conference, agreements and declaration connect the two sides.

Must repeat checks be every four hours?

No. The public form leaves each side’s maximum interval to agreement, followed by recorded repeat checks.

Do Part 6 initials replace the declaration signatures?

No. Part 6 records transfer agreement details; the declaration confirms completion of applicable checks and sets repeat intervals.