Guide · Air emissions and efficiency

MARPOL Annex VI: 0.50% sulphur cap, ECAs and CII

Updated 2026-10-08 · About 7 min read

In one sentence

Since 1 January 2020, the global fuel sulphur limit is 0.50% m/m and active sulphur ECAs require 0.10% m/m or approved equivalent controls; EEXI measures technical efficiency and applicable ships of at least 5,000 GT receive annual CII ratings from A to E.

Fuel sulphur limits

ScopeLimit and dateTag and source
Global cap0.50% m/m from 1 January 2020.Disclosed[S1]
Active sulphur ECAs0.10% m/m; a mass fraction, not a volume fraction.Disclosed[S1]
Approved equivalentsAdministration-approved exhaust gas cleaning systems can provide equivalent sulphur-emission control.Disclosed[S1]

ECA milestones

AreaSulphur-control statusTag and source
Baltic Sea and North Sea0.10% m/m sulphur limit applies.Disclosed[S1]
Designated North American and US Caribbean areas0.10% m/m applies within the defined boundaries.Disclosed[S1]
Mediterranean Sea0.10% m/m sulphur limit applies from 1 May 2025.Disclosed[S1]
Canadian Arctic waters and Norwegian SeaDesignation amendments entered into force on 1 March 2026; sulphur controls apply from 1 March 2027.Disclosed[S1]
North-East AtlanticAdopted, not yet in force: MEPC 84 (27 April – 1 May 2026) adopted the designation; the amendments are set to enter into force on 1 September 2027, with the ECA taking effect 12 months later in 2028. It is not a current requirement before then.Disclosed[S3]

EEXI versus CII

MeasureMeaning and scopeTag and source
EEXITechnical efficiency measure, generally for applicable ship types of at least 400 GT; check type, size and application provisions.Disclosed[S2]
CIIAnnual operational carbon intensity for specified ship types of at least 5,000 GT, including tankers. Ratings run A to E, with A best.Disclosed[S2]
Corrective actionThree consecutive D ratings or one E rating require a corrective action plan to achieve C or better.Disclosed[S2]

Practical checks

  • Check which sulphur ECAs the route enters and their application dates, then verify fuel sulphur or the approved equivalent method. Newly designated areas may have transition periods.[S1]
  • Sulphur and CII are separate checks: meeting the fuel sulphur limit does not establish a C-or-better annual CII rating.[S1][S2]
  • A fuel name does not replace its specification; match the actual fuel to the ship’s machinery and emissions requirements.[B2]

Questions

Can 0.50% fuel be used directly in a sulphur ECA?

Areas applying the 0.10% limit require compliant fuel or an approved equivalent emissions-control method.

Does every ship above 400 GT need a CII rating?

No. CII starts at 5,000 GT for specified ship types within its application provisions; EEXI has a different scope.

Does one D rating require a corrective action plan?

The stated trigger is three consecutive D ratings or one E rating.

Sources