Guide · Stability and loading

Ship stability: GM, GZ and loading condition

Updated 2026-10-11 · About 6 min read

In one sentence

GM describes initial stability and GZ the righting lever; loading, ballast and flooding require the applicable stability checks.

Centre of gravity, buoyancy, metacentre and initial stability

GM is the initial metacentric height between the centre of gravity G and metacentre M; the gravity and buoyancy force lines during heel are used to analyse the righting lever. The teaching model reviewed is limited to small angles: positive GM indicates stability near upright, zero GM indicates zero initial stability and negative GM indicates instability near upright. It does not establish equilibrium at every angle or inevitable capsize.[S1][S2][B1]

At small angles, GZ≈GM×sinθ expresses the lever in the teaching formula using GZ notation; it is not a calculation formula prescribed by the IS Code. At larger heel angles, consult the ship’s GZ curve and applicable criteria.[S1][S2][S3][B1]

GZ curves and the scope of intact stability criteria

The general criteria in Part A 2.2 of the 2008 IS Code, adopted by MSC.267(85), check GZ-curve areas, lever, angle of maximum lever and initial metacentric height, with allowance for liquid-surface effects. GM alone cannot replace the complete assessment; first check vessel type, applicable loading conditions and Administration-approved criteria.[S3][B1]

For containerships longer than 100 metres, the Administration may apply the corresponding alternative criteria in Part B 2.3; the ship cannot choose them unilaterally. This page explains the provisions and concepts reviewed, rather than a complete current consolidated text. For application, check the latest text, applicable flag requirements and company procedures.[S3][B1]

Loading, ballast and load lines

All applicable loading conditions must meet stability requirements using the approved stability booklet and relevant calculations. There is no universal fixed ballast quantity for an unloaded ship; tank selection and liquid levels must be assessed using the ship’s loading and stability information.[S3][B2]

Freeboard is measured vertically downwards amidships from the upper edge of the deck line to the upper edge of the relevant load line. Distinguish summer, winter, tropical and winter North Atlantic requirements from freshwater-density allowances; check the conditions for the winter North Atlantic line. Load lines do not replace stability calculations.[S4][S3][B3]

Intact stability, damage stability and ship-specific information

Intact and damage stability require their respective applicable information. In the probabilistic subdivision framework of SOLAS II-1, A≥R is one condition for adequate subdivision; partial-index and other requirements also apply. The prescribed loading-condition partial indices are weighted to form the total index; a sum for a single condition is not the total A.[S5][S6][B4][B1]

The probabilistic framework has vessel-type, length, construction-date and other-convention exceptions; tankers, chemical tankers and gas carriers also require checks against their specific instruments. This page cites the original amendments reviewed and does not certify a particular ship; assess loading, ballast or flooding against the ship’s approved information and applicable procedures.[S5][S6][S3][B4]

Questions

Does zero GM mean neutral equilibrium at every angle?

No. It describes initial stability near upright and cannot establish behaviour at larger heel angles.

Is a fixed ballast quantity required when unloaded?

There is no universal quantity; control tank selection and liquid levels using the ship’s loading and stability calculations.

What distance is freeboard?

The vertical distance downwards amidships from the upper edge of the deck line to the upper edge of the relevant load line.

Why is GM alone insufficient?

GM describes initial stability near upright; at larger heel angles, the complete GZ curve and applicable criteria must also be checked.

Sources